Monday, August 27, 2018

HWY 277 Construction - CC Winn Entrance

The construction detail on Hwy 277 is at an all time high around CC Winn High School.
The lanes are currently being changed in front of the school, so we are asking for use of this road into the campus to avoided if possible.
Caution and limited visibility in that area is HIGHLY advised!

Thank you for your cooperation.